...

Loft Builders
for London Homes,
With Design and
Engineering Included

Loft builders turn a roof space into a room, but the best ones handle far more than the building work. At London Lofts, the crew, the architect and the engineers on every loft conversion all work for one firm.

This page is written for homeowners comparing builders for the first time.

Each section ends with a short note from the site team.

The aim is to help you compare firms fairly, including us.

That matters, because most loft problems come from gaps between separate firms.

Separate designers, engineers and contractors can each blame the other when something goes wrong.

With one firm, the site manager can pick up the phone to the architect directly.

Decisions that might take days between firms take minutes.

It also means one contract, one programme and one person to call.

Our builders, electricians and plumbers all work as part of the London Lofts team.

This guide explains what good loft builders do on site and how to check a firm before you sign. It also covers what a fair quote includes and how long the work takes.

Want to meet the people who would build your loft? Our site managers answer 020 8050 1825; survey requests can go through the website.

Loft Conversion Builders With Their Own Architect and Engineers

Loft conversion builders work best when design and engineering sit in the same firm.

Plans and steel sizes drawn by colleagues, not strangers

Our ARB-registered architect and structural engineers work with the site crew every week.

The drawings are made with the build in mind, so details work on site first time.

The site manager reviews them before anything is ordered.

Materials are then ordered for the whole job at once.

That avoids waiting for deliveries halfway through.

Problems solved on site the same day

If the opened roof reveals a surprise, the designer can answer quickly.

A revised detail can follow quickly, so work rarely stops for long.

Changes are agreed with you in writing before they go ahead.

That keeps the programme and price clear.

Small changes rarely affect the finish date.

Bigger changes are priced and dated before anyone agrees to them.

You stay in control of every decision.

Our office confirms each change by email, so there is a clear record.

On site: one firm means one point of responsibility.

Who carries a domestic client’s legal duties under the ConstructionWho carries a domestic client’s legal duties under the Construction

Loft Builders London Families Can Check Before Signing a Contract

Loft builders London families hire should be easy to check.

Asking for registration numbers

Ask for each registration number and check it on the official register.

A firm that shares these readily is usually confident in its work.

Check the company name on the register matches the one on the quote.

Registers also show whether membership is current.

Lapsed memberships are worth asking about.

Our own registration details are available on request.

Anyone calling themselves an architect can be checked on the ARB register.

Seeing a finished loft nearby

A good firm can show you finished lofts on similar houses.

Ask, too, for a phone number of a recent customer.

Look for lofts of the same type as yours, such as a dormer on a terrace.

Photos are useful, but seeing a finished room in person is better.

It also shows how tidy the firm leaves a house.

Ask the owner how the crew dealt with neighbours and mess.

Their answers often say more than any brochure.

A firm that is proud of its work will welcome the question.

What a Loft Conversion Builder Does Week to Week on Site

A loft conversion builder follows a set order on site. For a typical London house, the building phase lasts 8 to 12 weeks.

  1. Weeks one and two: scaffold and structure

    In the opening fortnight or so, scaffold goes up, the steels are lifted in and the new floor is laid.

    The roof is covered as soon as it is opened, so the house below stays dry.

    A skip and material deliveries are timed to suit the street.

    Neighbours are told in advance about the scaffold.

    Parking and access are planned before the first day on site.

    On tight London streets, a scaffold licence may be needed from the council.

    The roof is protected from the weather as soon as it is opened.

  2. The middle weeks: shell, stair and services

    Then comes the longest stretch, four to eight weeks, when the dormer, stud walls, stair and services are built.

    Electrics and pipework are fitted before the walls are boarded.

    The stair is built in place to fit the exact opening.

    Fire doors and smoke alarms are fitted at the same stage.

    A protected escape route runs down through the house.

    Interlinked alarms on every storey sound together.

    First-fix wiring and pipework go in before the walls are boarded.

  3. The final weeks: plaster, fittings and handover

    Insulation, plaster and final fittings close out the job over roughly two to four weeks. Our timescales guide has more detail.

    Snagging is finished before handover, along with all the certificates.

    Handover comes with your wiring and boiler certificates plus the structural warranty.

    Snagging is completed before handover, with certificates provided.

Loft Conversion Builders London Owners Use for Dormers, Gables and Mansards

Loft conversion builders London homeowners choose build three main types.

Garden-side dormers for long terraces

A rear dormer adds standing height. See our terraced guide.

It is the most common loft on London terraces.

Its windows usually line up with those below, keeping the rear tidy.

Lead or tile cheeks finish the sides neatly.

Insulation is fitted to meet current energy rules.

Rooflights and dormer windows are sealed carefully against draughts.

Good sealing keeps heat in through the colder months.

New brick end walls in place of a hip

Hip to gable rebuilds the sloping side. See our semi guide.

A rear dormer usually completes the room.

Matching brick or render keeps the new wall in keeping.

The new gable also carries part of the extended roof.

A rear dormer is often built at the same time.

Together they turn a hipped roof into a full new floor.

It is the classic loft on a London semi.

Mansards where precedent exists on the row

A mansard swaps the sloping back roof for a steep, almost upright face under a near-flat crown. Our mansard guide explains it.

Councils usually want a planning application, and approval is likelier where the row already has some.

Steelwork, Joists and the Weathertight Stage

The structural stage comes first.

Steels set on padstones

Steel beams rest on padstones in the walls.

The engineer specifies their size and position.

Padstones spread the load so the wall below is not overstressed.

Temporary props hold the roof while steels are fitted.

Steels are usually lifted in through the roof, often in a single day.

The engineer’s calculations are kept on site for the inspector.

Every bearing and connection is built exactly as drawn.

Our site manager checks each stage against the drawings.

A watertight shell before the old ceiling opens

The roof is made watertight before the stair opening is cut.

That keeps dust and weather away from the rooms below for as long as possible.

The stair opening is often one of the last jobs, for the same reason.

Dust screens protect the landing below when it is cut.

Daily clean-ups keep the house usable throughout.

Most families stay at home throughout the build.

Party Walls, Building Control and Council Approvals

Approvals run alongside the build.

Notices to the neighbours

Our office prepares and serves the party wall notices for you.

On terraces, both neighbours usually receive notice.

Two months’ notice is needed before work on a shared wall.

Neighbours have 14 days to respond to a notice.

Where they appoint a surveyor, an award sets out the work.

Clear drawings help neighbours agree quickly.

Building Control visits at key stages

Inspectors visit during the work and sign off at the end.

Inspectors usually come once the beams are fixed, and again before plasterboard hides them.

Our site manager books each inspection at the right time.

Any comments from the inspector are dealt with straight away.

The final certificate confirms the loft meets the regulations.

A certificate or a planning decision

See the Planning Portal for the rules.

Most London lofts can use a lawful development certificate, unless the street is protected.

Conservation areas and Article 4 directions need planning permission instead.

We confirm the route for your address before quoting.

Most London lofts can go ahead under permitted development.

A lawful development certificate confirms this in writing.

What a Fair Loft Quote Should Include

A fair quote should be clear and complete.

A measured survey behind the price

A price without a survey is a guess.

Ask how the figures were worked out.

A builder who has measured the roof can explain each line.

Vague lump-sum quotes are a warning sign.

So are prices given over the phone without a visit.

A detailed quote should follow a proper survey.

Stairs, insulation and fire safety listed

These should all be itemised.

So should party wall costs, scaffolding and skips.

Missing items often reappear later as extras.

Ask what happens if something unexpected is found.

A good firm explains how surprises are priced before work starts.

That way, there are no arguments about extras later.

What is excluded, in writing

Exclusions should be stated clearly.

An itemised quote makes side-by-side comparison simple and stops costs creeping up.

Credentials Worth Checking on Any Firm

Registers make it easy to check a firm.

Four official registers a homeowner can search, and what each one provesFour official registers a homeowner can search, and what each one proves

TrustMark, NICEIC, Gas Safe and FMB

TrustMark, NICEIC, Gas Safe and the FMB all have searchable lists.

You can also check an architect on the ARB register.

Insurance and a structural guarantee

Ask for public liability insurance and a written guarantee.

Make sure the insurance runs through the whole build period.

Ask for a copy of the certificate, not just a verbal answer.

A long trading history gives a guarantee real weight.

Our Loft Build Process in Six Stages

  • A surveyor from the build team measures the roof, the stair and the walls.
  • The planning route is confirmed: certificate, full application or prior checks for a protected street.
  • Our architect draws plans and elevations, with any heritage statement needed.
  • Engineers size every beam, joist and support, shown on the same drawing set.
  • Paperwork goes to the council, and our office sends the neighbours their party wall notices.
  • Construction is carried out by the London Lofts crew before Building Control issues its certificate.

Our loft builders bring 25 years of London projects and more than 250 completed lofts. Nearly all, 98 in every 100, were finished when promised.

Ahead of the scaffold, you get a written timetable and a short note on what moves the price.

Electrical installations by our team carry NICEIC certification; boilers and heating carry Gas Safe registration. TrustMark recognises the business through NAPIT, and the FMB has it on its member list. Public liability insurance applies on every site, and each new loft structure is guaranteed for ten years in writing.

Builders, Quotes and Timings: Questions Answered

How much do loft builders charge?

Price is driven by the loft type and floor area, the amount of structure, the consent route and the finish specification. An accurate quote needs a survey first.

On-site weeks: how long do loft conversion builders need?

Our crews normally spend 8 to 12 weeks on a London loft, once drawings and approvals are done.

Loft builders London homeowners hire: who handles planning?

A good firm prepares the drawings and applies for the certificate or planning permission on your behalf.

Starting before approval: can a loft conversion builder do that?

Not usually. Building work should wait until the certificate or planning permission is in place, and party wall notices have run.

Design-and-build or separate trades: what should I pick?

Design-and-build usually carries less risk, because one company answers for the whole loft. Our specialist guide covers this in more depth.

Comparing quotes from different loft builders? Phone our estimating team on 020 8050 1825; quotes can also be emailed across.

Loft living room with a sofa under the sloping ceiling and rooflights

Meet the Crew Who Would Build Your Loft

A free visit puts you in front of the crew who would build your loft, with an honest answer about what the roof will hold. Ring 020 8050 1825 and pick a suitable morning, or book through the site.