Loft Conversion
and Extension
London: Two
Projects, One Team
and One Programme

A loft conversion and extension London homeowners plan together can transform a house in one go. London Lofts and Extensions work is designed, approved and built by a single in-house team, from the roof down to the garden doors.

Many families want both: a new bedroom and bathroom in the roof, and a bigger kitchen or living room on the ground floor. Doing the two as separate jobs, with separate firms, usually means two sets of drawings, two rounds of disruption and twice the waiting.

London Lofts and Extensions work is most common on Victorian terraces and 1930s semis, where both the roof and the garden have room to spare.

Detached houses on the city’s edge, from Chingford to Kingston, also suit the approach.

Planning them together lets one design, one steel calculation and one programme cover the whole house. This page explains how that works, the planning rules for each half, and how we keep the family at home while we build.

London houses suit this approach especially well. Victorian terraces have deep back gardens and tall roofs, and inter-war semis often have room at both the side and the back.

Thinking about building up and out? Phone 020 8050 1825, or tell us about the house online for a free survey of both the roof and the garden.

Loft Conversion and Extension London Homes Gain Most From When Planned Together

A loft conversion and extension London owners design as one scheme nearly always works better than two separate projects.

One design for the whole house

When the roof and the ground floor are drawn together, the new stair, the bathroom positions and the open-plan kitchen can all line up. Pipes, cables and structure then follow the shortest route through the house.

It also helps the family picture the finished home. A bedroom upstairs and a kitchen-diner downstairs are planned around how you actually live.

Light can be planned through the whole house too, with rooflights in the extension and windows in the dormer working together.

Heating is planned once too, so a single boiler or an air-source heat pump can serve both new spaces.

Insulation and ventilation are designed for the whole house, rather than each new room on its own.

Why separate firms cost time

With two contractors, each waits for the other’s drawings and calculations. Scaffolding goes up twice, the neighbours are disturbed twice, and small clashes between the two designs have to be solved on site.

Each firm also prices its own scaffolding, skips and site set-up, so costs overlap.

Responsibility for any problem is also split, which can leave a homeowner in the middle.

With one firm, there is never any question of who fixes what.

Both projects: one survey and one design team avoid most of those delays.

A Loft and Extension Company That Keeps Design, Approvals and Build in House

As a loft and extension company, we handle every stage ourselves.

Measured survey, plans and steel design in one agreement

One surveyor measures the whole house, from ridge to garden wall. Our ARB-registered architect then draws both projects. The engineering team sizes every beam, upstairs and down, in one set of calculations.

Electricians, plumbers and carpenters in the London Lofts team

The builder on site, the electrician, the plumber and the carpenter all belong to our own team. One named contact keeps you updated, and one contract covers both halves of the work.

Kitchens, bathrooms and joinery are fitted by the same team, so finishes match on both floors.

As one contractor for both projects, we also take responsibility for how the two parts join.

We also order materials for both projects together, which keeps deliveries simple.

Both projects: a single team means a single point of responsibility.

Loft Conversion and Rear Extension: Building Up and Out on the Same House

The most common pairing in London is a loft conversion and rear extension.

A generic house in side section with a single-storey rear extension, showing the Class A permitted development limitsA generic house in side section with a single-storey rear extension, showing the Class A permitted development limits

Three metres by right, six with prior approval

Under permitted development, a single-storey rear extension can usually reach 3 metres on an attached house, or 4 metres on a detached one. Through the larger home extension prior approval scheme, those limits rise to 6 and 8 metres, with neighbours consulted first.

Hounslow’s guidance gives the same figures and explains the notification process. The extension must stay under 4 metres high.

Council guidance such as Rushmoor’s adds that the eaves must stay under 3 metres, and the depth is measured from the original rear wall.

Side extensions and wraparound designs have their own, separate rules, and most need full permission in London.

A single-storey kitchen extension at the back is often the simplest ground-floor partner for a dormer loft.

A dormer and a rear extension designed as a pair

Upstairs, a rear dormer adds a bedroom and shower room. Downstairs, a single-storey extension with bi-fold doors and rooflights opens the kitchen to the garden. See our terraced lofts guide for the loft side.

Designed together, the loft stair can land beside the new kitchen. Waste from the loft shower can also join the extension’s new drains.

Both new rooms can also share one heating and electrical upgrade, rather than two.

Both projects: the two halves share steels, drainage and one set of drawings.

Two Planning Routes, One Application Strategy for the Roof and the Ground Floor

The loft and the extension each follow their own planning rules, but we plan them as one strategy.

A two-by-two table of what article 2(3) land, which includes conservation areasA two-by-two table of what article 2(3) land, which includes conservation areas

Loft volume rules for the roof

The Planning Portal allows a terraced house to add 40 cubic metres of roof space and a semi 50, with nothing on the street-facing slope.

Once the loft stays within those limits, a lawful development certificate confirms it.

Back-slope rooflights rarely need consent outside protected areas, if they stand barely above the tiles.

How far a ground-floor addition may reach

A rear extension has its own depth and height limits, separate from the loft allowance. A side return or wraparound design usually needs full planning permission.

Where both projects fall within permitted development, each still needs its own checks, but neither needs a full planning application.

Either way, we explain the route in writing before the detailed design work starts.

Where conservation areas change both answers

In a conservation area, the larger prior approval scheme does not apply, and roof extensions need planning permission. We then make one combined application for both projects.

Where an Article 4 direction applies, even a small extension or a rear dormer may need consent.

Our area guides set out those controls street by street across London.

Both projects: we confirm both routes before any detailed drawing.

Sequencing the Work So the Family Can Stay at Home

Careful sequencing keeps a house usable during the build.

Loft first, extension second, or both at once

Often the loft conversion is built first, with access from scaffolding outside, while the ground floor carries on as normal. The extension then follows, or both run together on larger jobs.

Where the extension comes first, the new kitchen can be finished before work moves upstairs.

The order is agreed in writing at the start, so everyone knows what happens when.

Keeping a kitchen and bathroom working during the build

We plan a temporary kitchen and keep at least one bathroom working wherever possible. That way, most families stay at home for the whole project.

Dust screens, a protected route through the house and agreed working hours make the months on site easier.

Neighbours are told in advance when the scaffold, skips and deliveries will arrive.

Loft and Extension Specialists for Terraces, Semis and Period Houses

As loft and extension specialists, we adapt the design to each house type.

Victorian terraces with long back wings

Here, an L-shaped loft over the main roof and back wing pairs well with a side return extension below.

Many London terraces already have neighbours who have done the same, which helps the design and the planning case.

Inter-war semis where a gable and a rear addition both fit

On a 1930s semi, a hip to gable loft and a rear house extension can transform both floors. See our semi lofts guide.

Matching the other half of the pair keeps both houses looking balanced from the street.

A single-storey rear extension then opens the ground floor to the garden.

Listed and protected houses

Listed houses and conservation areas need careful, sympathetic design and full permissions for both parts.

We prepare heritage statements and keep alterations modest, so the character of the house is respected.

Structural Steel, Party Walls and Building Control Across Both Projects

Combining the projects simplifies the technical side.

  1. Steel beams shared between floors

    An RSJ that opens up the kitchen can also support loads from the new loft above, so the engineering is designed once.

    Foundations for the extension are designed at the same time, so no structure is built twice.

    Where the new steel sits on a party wall, the neighbour is notified before work starts.

  2. One party wall notice set for both jobs

    We arrange party wall notices on your behalf, covering both projects at the same time.

    That avoids sending neighbours two separate rounds of notices months apart.

  3. Building Control sign-off for each part

    Each part is inspected, and the whole house is signed off at the end.

    You receive the completion certificates, the electrical and gas certificates, and the structural guarantee together.

How London Lofts and Extensions Are Delivered, Numbered

Six stages take both projects through.

Roof and garden measured together

  • Our surveyor maps the roof timbers, the back wall, the drains and the garden levels in one visit.
  • We confirm the planning route for the loft and, separately, for the ground-floor addition.

Plans and permissions for both projects

  • Our architect prepares one set of drawings showing both projects and how they connect.
  • Steel beams, foundations and the new loft floor are calculated together by our engineers.
  • The council receives the right application or notification for each part, and party wall notices go to every neighbour affected.

Building and handover

  • Our team builds the loft and the extension in the agreed order, and Building Control signs each part off.

Once both parts are surveyed, a dated programme arrives, plus a plain note on the choices that change the cost.

London Lofts has 25 years of experience and more than 250 completed projects, 98 per cent handed over on time.

On a combined loft and extension, electrics are certified through NICEIC and gas appliances through Gas Safe. Our TrustMark listing comes via NAPIT, and FMB membership sits alongside it. Public liability insurance covers every combined project, and the new loft and extension structures carry ten years of written cover.

The four steps of the prior approval process for a larger single-storey rear extension of up to 6 metresThe four steps of the prior approval process for a larger single-storey rear extension of up to 6 metres

Loft or Extension, Cost and Order of Work: Questions Answered

Should I choose a loft conversion or an extension?

It depends on what the house is missing. A loft conversion usually adds a bedroom and bathroom without touching the garden. An extension adds kitchen or living space on the ground floor. Many families end up wanting both.

Loft conversion vs extension: which adds more space?

That depends on the roof height and the garden depth. A large dormer loft can add a whole new floor, while an extension adds space where the family spends the day. We measure both before advising.

Is a loft conversion cheaper than an extension?

Not always. The answer depends on how much structure each needs, the planning route, and the finishes chosen. A simple rooflight loft can cost less than a large glazed extension, and the reverse is also true.

What affects the cost of a loft conversion and extension?

Cost mostly follows the size of each part, how much steel is needed, which planning route applies, the glazing, and the kitchen and bathroom finishes. Building both together usually saves on scaffolding, design and party wall costs.

Should the loft or the extension come first?

Usually the loft goes first, because it can be built from scaffolding while the ground floor stays usable. On some houses, both run at the same time to shorten the programme.

Do you build loft conversions and extensions together?

Yes. We design, approve and build both as one project, under one contract, with our own team.

Still weighing up a loft, an extension or both? Talk it through on 020 8050 1825; plans and photos can also go through our form.

Long loft room with rooflights on both slopes and a bed at the far end

One No-Cost Visit Covers Both the Roof and the Garden

On one free visit, we measure the roof and the rear of the house, check the planning routes and talk through the options. Arrange it on 020 8050 1825; the online form works for loft and extension enquiries too.

For the roof-only option, our home page explains our loft conversions across London.